Merino Mall Integrated Water Facility
Published case-study claim: R1.4 million annual saving.
Read insight →Knowledge
July 28, 2026
Published case-study claim: R1.4 million annual saving.
Read insight →July 28, 2026
Underground installation fine-tuned against unusually high mall-effluent COD.
Read insight →July 28, 2026
Published case-study claim: over R1.2 million annual saving and 1.2-year payback.
Read insight →July 28, 2026
Process capacity was increased to an equivalent 140 m3/day retention basis to manage the measured COD load.
Read insight →