Shopping centre · South Africa

Carletonville Centre Potable Water

Published case-study claim: over R1.2 million annual saving and 1.2-year payback.

Published commercial outcomeR1.2m+

published annual saving

SewTreat-published case-study claim
LocationCarletonville, Gauteng
Capacity80 KLPD potable water treatment plant
ApplicationShopping centre
Treated-water destinationPotable water

Visual project record

See the treatment context, not only the claims.

Named-project photographs are identified as project images. Supporting photographs are labelled as representative SewTreat system references.

Potable-water treatment installationProject image

Potable-water treatment installation

Published SewTreat imagery from the Carletonville Centre project record.

Containerised filtration equipmentProject image

Containerised filtration equipment

Published SewTreat imagery from the Carletonville Centre project record.

Alternative-source treatmentSystem reference

Alternative-source treatment

Representative borehole-water treatment and storage configuration.

Executive project brief

The challenge

Unreliable council supply and borehole water containing turbidity, iron and manganese created a need for an independent treated-water supply.

Hydraulic duty80 KLPD potable water treatment plant
Water streamWater
Operating contextShopping centre
Required destinationPotable water

Solution architecture

The following elements are documented in SewTreat’s published project record.

  1. 37 KL raw-water storage
  2. Containerised AFM, GAC and DMI filtration
  3. Bag filtration and chlorine disinfection
  4. 72 KL clean-water storage
  5. Automated dosing, monitoring and municipal switchover

Engineering assurance

Characterise

Validate the water profile, duty and variability.

Integrate

Define civils, power, controls, storage and existing interfaces.

Operate

Plan access, skills, residuals, consumables and maintenance.

Verify

Agree commissioning, sampling and acceptance evidence.

Published outcome

Published case-study claim: over R1.2 million annual saving and 1.2-year payback.

What the project demonstrates

  • 67 m3/day treated-water supply
  • Reduced council dependence
  • Automated operation
  • Published saving and payback claim

Before procurement

  1. Representative water analysis completed
  2. Average, peak and future flows validated
  3. Required standard and destination made explicit
  4. Civils, utilities, storage and distribution interfaces defined
  5. Operating and maintenance model resourced
  6. Commissioning evidence and acceptance criteria agreed

Source: Carletonville Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.

Published project evidence

The original SewTreat case-study record.

The complete source sheet is shown alongside the web case study so the project photography, published figures and treatment narrative remain inspectable.

Open the case-study PDFSource: Carletonville Case Study
Carletonville Centre Potable Water published case-study sheet 1
Published case-study sheet 1 of 2
Carletonville Centre Potable Water published case-study sheet 2
Published case-study sheet 2 of 2

Engineer-led next step

Discuss a similar water or wastewater project.

Share the source, flow and outcome you need. Water Treat can use that context to prepare a useful first technical conversation.

Request a Water Audit No-obligation technical enquiry