Executive project brief
The challenge
Limited and expensive municipal supply had to be balanced against shopping-centre wastewater with elevated organic loading and biological oxygen demand.
Solution architecture
The following elements are documented in SewTreat’s published project record.
- Wastewater plant configured for high BOD
- Borehole treatment using active filtration media
- Granular activated carbon filtration
- Integrated reuse across toilets, firewater and irrigation
- Ongoing operations and maintenance
Engineering assurance
Characterise
Validate the water profile, duty and variability.
Integrate
Define civils, power, controls, storage and existing interfaces.
Operate
Plan access, skills, residuals, consumables and maintenance.
Verify
Agree commissioning, sampling and acceptance evidence.
Published outcome
Published case-study claim: R1.4 million annual saving.
What the project demonstrates
- Integrated supply and wastewater strategy
- Water reuse
- Operational reliability
- Published cost saving
Before procurement
- Representative water analysis completed
- Average, peak and future flows validated
- Required standard and destination made explicit
- Civils, utilities, storage and distribution interfaces defined
- Operating and maintenance model resourced
- Commissioning evidence and acceptance criteria agreed
Source: Merino Mall Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.