Education and student accommodation · South Africa

University of Johannesburg Greywater Reuse

Published case-study claim: R1.5 million annual saving.

Published commercial outcomeR1.5m

published annual saving

SewTreat-published case-study claim
LocationJohannesburg, Gauteng
Capacity64 KLPD greywater treatment plant
ApplicationEducation and student accommodation
Treated-water destinationToilet flushing and sports-field irrigation

Visual project record

See the treatment context, not only the claims.

Named-project photographs are identified as project images. Supporting photographs are labelled as representative SewTreat system references.

UJ greywater treatment systemProject image

UJ greywater treatment system

Published SewTreat imagery from the University of Johannesburg project record.

Treatment equipment and integrationProject image

Treatment equipment and integration

Published SewTreat imagery from the University of Johannesburg project record.

Completed greywater plantProject image

Completed greywater plant

Published SewTreat imagery from the University of Johannesburg project record.

Executive project brief

The challenge

Two student residences generated significant greywater volumes while the university faced rising municipal tariffs and growing pressure to improve water security.

Hydraulic duty64 KLPD greywater treatment plant
Water streamWater
Operating contextEducation and student accommodation
Required destinationToilet flushing and sports-field irrigation

Solution architecture

The following elements are documented in SewTreat’s published project record.

  1. Turnkey 64 KLPD greywater treatment facility
  2. Plumbing retrofits to redirect treated water to toilets
  3. Civil and distribution infrastructure
  4. Irrigation integration with municipal top-up for continuity

Engineering assurance

Characterise

Validate the water profile, duty and variability.

Integrate

Define civils, power, controls, storage and existing interfaces.

Operate

Plan access, skills, residuals, consumables and maintenance.

Verify

Agree commissioning, sampling and acceptance evidence.

Published outcome

Published case-study claim: R1.5 million annual saving.

What the project demonstrates

  • Reduced potable-water demand
  • Water-tariff reduction
  • Productive greywater reuse
  • Improved water security

Before procurement

  1. Representative water analysis completed
  2. Average, peak and future flows validated
  3. Required standard and destination made explicit
  4. Civils, utilities, storage and distribution interfaces defined
  5. Operating and maintenance model resourced
  6. Commissioning evidence and acceptance criteria agreed

Source: UJ Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.

Published project evidence

The original SewTreat case-study record.

The complete source sheet is shown alongside the web case study so the project photography, published figures and treatment narrative remain inspectable.

Open the case-study PDFSource: UJ Case Study
University of Johannesburg Greywater Reuse published case-study sheet 1
Published case-study sheet 1 of 1

Engineer-led next step

Discuss a similar water or wastewater project.

Share the source, flow and outcome you need. Water Treat can use that context to prepare a useful first technical conversation.

Request a Water Audit No-obligation technical enquiry