Distribution and logistics · South Africa

Pick n Pay Eastport Logistics Park

Published case-study claim: R4.7 million annual saving.

Published commercial outcomeR4.7m

published annual saving

SewTreat-published case-study claim
LocationJohannesburg, Gauteng
Capacity500 KLPD combined greywater and rainwater system
ApplicationDistribution and logistics
Treated-water destinationCooling towers and truck wash bay

Visual project record

See the treatment context, not only the claims.

Named-project photographs are identified as project images. Supporting photographs are labelled as representative SewTreat system references.

Eastport logistics facilityProject image

Eastport logistics facility

Published SewTreat imagery of the Pick n Pay Eastport operating context.

Rainwater harvesting infrastructureProject image

Rainwater harvesting infrastructure

Published SewTreat imagery from the Eastport rainwater-recovery system.

Truck-wash water recoveryProject image

Truck-wash water recovery

Published SewTreat imagery from the Eastport washbay-recycling system.

Executive project brief

The challenge

The logistics hub required substantial water for cooling and truck washing, creating high municipal-water costs and a need for a more resilient supply strategy.

Hydraulic duty500 KLPD combined greywater and rainwater system
Water streamWater
Operating contextDistribution and logistics
Required destinationCooling towers and truck wash bay

Solution architecture

The following elements are documented in SewTreat’s published project record.

  1. Three-million-litre rainwater collection dam
  2. One-million-litre underground treated-water sump
  3. Rainwater treatment supplying up to 300,000 litres daily
  4. Biological washbay-water treatment processing 150,000 litres daily

Engineering assurance

Characterise

Validate the water profile, duty and variability.

Integrate

Define civils, power, controls, storage and existing interfaces.

Operate

Plan access, skills, residuals, consumables and maintenance.

Verify

Agree commissioning, sampling and acceptance evidence.

Published outcome

Published case-study claim: R4.7 million annual saving.

What the project demonstrates

  • Municipal-water displacement
  • Integrated rainwater and wastewater reuse
  • Lower operational water exposure
  • Published cost saving

Before procurement

  1. Representative water analysis completed
  2. Average, peak and future flows validated
  3. Required standard and destination made explicit
  4. Civils, utilities, storage and distribution interfaces defined
  5. Operating and maintenance model resourced
  6. Commissioning evidence and acceptance criteria agreed

Source: Pick n Pay Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.

Published project evidence

The original SewTreat case-study record.

The complete source sheet is shown alongside the web case study so the project photography, published figures and treatment narrative remain inspectable.

Open the case-study PDFSource: Pick n Pay Case Study
Pick n Pay Eastport Logistics Park published case-study sheet 1
Published case-study sheet 1 of 1

Engineer-led next step

Discuss a similar water or wastewater project.

Share the source, flow and outcome you need. Water Treat can use that context to prepare a useful first technical conversation.

Request a Water Audit No-obligation technical enquiry