Mining · Botswana

Morupule Coal Mine

Treatment configured for variable contamination and peak flows during shift changes.

Published project proof point100 KLPD

containerised mine treatment

Published SewTreat project record
LocationPalapye, Botswana
Capacity100 KLPD containerised wastewater plant
ApplicationMining
Treated-water destinationIrrigation, toilet flushing and dust suppression

Visual project record

See the treatment context, not only the claims.

Named-project photographs are identified as project images. Supporting photographs are labelled as representative SewTreat system references.

Containerised plant architectureSystem reference

Containerised plant architecture

Representative packaged treatment, controls and mechanical integration.

Modular steel-tank treatmentSystem reference

Modular steel-tank treatment

Representative SewTreat steel-tank biological treatment architecture.

Maintainable operating assetLifecycle reference

Maintainable operating asset

Representative access, service and lifecycle-support context.

Executive project brief

The challenge

Mine expansion increased wastewater complexity, including solids, hydrocarbons and coal duff. Peak inflows during shift changes affected pH, retention and COD reduction.

Hydraulic duty100 KLPD containerised wastewater plant
Water streamSanitation
Operating contextMining
Required destinationIrrigation, toilet flushing and dust suppression

Solution architecture

The following elements are documented in SewTreat’s published project record.

  1. 100 KLPD containerised plant
  2. 25 KL buffer tank for peak periods
  3. IFAS process combining moving-bed bioreactor and activated-sludge return
  4. Dosing and buffering configured around variable loads

Engineering assurance

Characterise

Validate the water profile, duty and variability.

Integrate

Define civils, power, controls, storage and existing interfaces.

Operate

Plan access, skills, residuals, consumables and maintenance.

Verify

Agree commissioning, sampling and acceptance evidence.

Published outcome

Treatment configured for variable contamination and peak flows during shift changes.

What the project demonstrates

  • Improved effluent management
  • Operational flexibility
  • Non-potable reuse
  • Reduced environmental demand

Before procurement

  1. Representative water analysis completed
  2. Average, peak and future flows validated
  3. Required standard and destination made explicit
  4. Civils, utilities, storage and distribution interfaces defined
  5. Operating and maintenance model resourced
  6. Commissioning evidence and acceptance criteria agreed

Source: Morupule Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.

Published project evidence

The original SewTreat case-study record.

The complete source sheet is shown alongside the web case study so the project photography, published figures and treatment narrative remain inspectable.

Open the case-study PDFSource: Morupule Case Study
Morupule Coal Mine published case-study sheet 1
Published case-study sheet 1 of 1

Engineer-led next step

Discuss a similar water or wastewater project.

Share the source, flow and outcome you need. Water Treat can use that context to prepare a useful first technical conversation.

Request a Water Audit No-obligation technical enquiry