Food and beverage · Mozambique

AB InBev Beira Brewery

Complete system designed, manufactured, assembled and installed within the published two-month programme.

Published project proof point2 months

published delivery programme

Published SewTreat project record
LocationBeira, Mozambique
Capacity30 KLPD containerised wastewater plant
ApplicationFood and beverage
Treated-water destinationToilet flushing, non-potable washing and irrigation

Visual project record

See the treatment context, not only the claims.

Named-project photographs are identified as project images. Supporting photographs are labelled as representative SewTreat system references.

Industrial effluent treatmentSystem reference

Industrial effluent treatment

Representative industrial treatment architecture configured around source-specific loading.

Containerised plant architectureSystem reference

Containerised plant architecture

Representative packaged treatment, controls and mechanical integration.

Productive treated-water reuseWater-reuse reference

Productive treated-water reuse

Representative polishing and reuse context; final quality follows the required destination.

Executive project brief

The challenge

A new two-million-hectolitre-per-year brewery required a complete wastewater system within a tight programme while managing high peak flows during shift changes.

Hydraulic duty30 KLPD containerised wastewater plant
Water streamEffluent
Operating contextFood and beverage
Required destinationToilet flushing, non-potable washing and irrigation

Solution architecture

The following elements are documented in SewTreat’s published project record.

  1. Custom rapid-deployment containerised design
  2. Increased buffer capacity for peak inflow
  3. Manual intake, anaerobic and aerobic stages
  4. Clarification and final disinfection
  5. Treated-water reuse integration

Engineering assurance

Characterise

Validate the water profile, duty and variability.

Integrate

Define civils, power, controls, storage and existing interfaces.

Operate

Plan access, skills, residuals, consumables and maintenance.

Verify

Agree commissioning, sampling and acceptance evidence.

Published outcome

Complete system designed, manufactured, assembled and installed within the published two-month programme.

What the project demonstrates

  • Rapid execution
  • Stable peak-flow management
  • Non-potable reuse
  • Operational reliability

Before procurement

  1. Representative water analysis completed
  2. Average, peak and future flows validated
  3. Required standard and destination made explicit
  4. Civils, utilities, storage and distribution interfaces defined
  5. Operating and maintenance model resourced
  6. Commissioning evidence and acceptance criteria agreed

Source: Beira Brewery Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.

Published project evidence

The original SewTreat case-study record.

The complete source sheet is shown alongside the web case study so the project photography, published figures and treatment narrative remain inspectable.

Open the case-study PDFSource: Beira Brewery Case Study
AB InBev Beira Brewery published case-study sheet 1
Published case-study sheet 1 of 1

Engineer-led next step

Discuss a similar water or wastewater project.

Share the source, flow and outcome you need. Water Treat can use that context to prepare a useful first technical conversation.

Request a Water Audit No-obligation technical enquiry