Executive project brief
The challenge
No municipal wastewater service was available. Mall effluent contained high fats, oils and grease and COD above the expected design basis, requiring longer retention and a robust biological process.
Solution architecture
The following elements are documented in SewTreat’s published project record.
- Steel-tank and container hybrid plant
- Retention increased from 2.5 to 4.7 days
- IFAS process combining MBBR and RAS
- Configuration for seasonal and variable peak loads
Engineering assurance
Characterise
Validate the water profile, duty and variability.
Integrate
Define civils, power, controls, storage and existing interfaces.
Operate
Plan access, skills, residuals, consumables and maintenance.
Verify
Agree commissioning, sampling and acceptance evidence.
Published outcome
Process capacity was increased to an equivalent 140 m3/day retention basis to manage the measured COD load.
What the project demonstrates
- Environmental compliance
- Productive water reuse
- Remote-site operation
- Improved handling of high-contamination effluent
Before procurement
- Representative water analysis completed
- Average, peak and future flows validated
- Required standard and destination made explicit
- Civils, utilities, storage and distribution interfaces defined
- Operating and maintenance model resourced
- Commissioning evidence and acceptance criteria agreed
Source: KG Mall Case Study. Financial and performance figures are attributed to SewTreat’s published case-study material.